Neighborhoods › East Flatbush-Remsen Village › Building 3101840
Interior renovation: General construction work related to the removal and…, est. $225K
1084 Lennox Road, Brooklyn 10570 · Objections
| Job | B01422427 (4 filings: I1, S3, S1, S2) · Alteration |
|---|---|
| Category | interior renovation |
| Estimated cost | $225,000 |
| Scale | 4 → 4 stories; 225 sq ft |
| Work types | General Construction |
| Filed | Jul 22, 2026 |
| Professional | Savin Engineers |
| Building | BIN 3101840 · BBL 3046690037 |
| Official record | DOB NOW job B01422427 |
DOB description
B01422427-I1: General Construction work related to the removal and installation on new walk-in freezer. Scope includes excating existing slab on grade for floor drain relocation, remove & install new metal stair, and install new chain-link cage with door
B01422427-S3: Furnish and install 5000 PSI Cast-in place reinforced concrete pad for proposed mechanical equipment, and new steel stairs for areaway.
B01422427-S1: Removal & installation of 2 new air conditioning units and 1 new condensing unit including associated refridgerant lines, drain lines, supports, power and control wiring
B01422427-S2: Relocate floor drain & related piping and install new condensate drain piping
Status timeline
- Jul 22, 2026 — New job filed (Objections) B01422427-I1
- Jul 22, 2026 — New job filed (Objections) B01422427-S2
- Jul 22, 2026 — New job filed (Objections) B01422427-S3
- Jul 23, 2026 — New job filed (Objections) B01422427-S1
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.