Neighborhoods › Canarsie › Building 3223054
Interior renovation: Installation of non-accessory battery energy storage…, est. $750K
8914 Foster Avenue, Brooklyn 10953 · Objections
| Job | B01415105 (3 filings: I1, S1, S2) · Alteration CO |
|---|---|
| Category | interior renovation |
| Estimated cost | $750,000 |
| Scale | 1 → 1 stories; 6,368 sq ft |
| Work types | General Construction |
| Filed | Sep 20, 2026 |
| Professional | Tectonic Engineering Consultants, G |
| Building | BIN 3223054 · BBL 3079680041 |
| Official record | DOB NOW job B01415105 |
DOB description
B01415105-I1: INSTALLATION OF NON-ACCESSORY BATTERY ENERGY STORAGE EQUIPMENT (UG IV(C) INSTALLED ON CONCRETE PADS. THE PROPOSED SITE TO BE ENCLOSED IN 15 FEET H. 2 HOUR FIRE RATED ENERGY INFRASTRUCTURE (EIE) ENCLOSURE AND PROTECTED WITH NFPA 15 WATER SPRAY SYSTEM.
B01415105-S1: FOUNDATION WORK IN CONJUNCTION WITH INSTALLATION OF NON-ACCESSORY ENERGY STORAGE SYSTEM.
B01415105-S2: STRUCTURAL WORK IN CONJUNCTION WITH INSTALLATION OF NON-ACCESSORY ENERGY STORAGE SYSTEM.
Status timeline
- Sep 20, 2026 — New job filed (Objections) B01415105-I1
- Oct 7, 2026 — New job filed (Plan Examiner Review) B01415105-S1
- Oct 7, 2026 — New job filed (Plan Examiner Review) B01415105-S2
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.