Neighborhoods › Greenpoint › Building 3063760
New 6-story building, 6 units, est. $2.6M
1098 Manhattan Avenue, Brooklyn 10013 · Objections
| Job | B01371077 (8 filings: I1, S3, S5, S6, S4, S2, S7, S1) · ALT-CO - New Building with Existing Elements to Remain |
|---|---|
| Category | new building |
| Estimated cost | $2,567,000 |
| Scale | 3 → 6 stories; 5 → 6 dwelling units; 9,999 sq ft |
| Work types | General Construction |
| Filed | Apr 29, 2026 |
| Professional | Michael Muroff Architect Llc |
| Building | BIN 3063760 · BBL 3024880003 |
| Official record | DOB NOW job B01371077 |
DOB description
B01371077-I1: EXISTING CLASS OF CONSTRUCTION II-B 1968 BC, 3 STORY MIXED USE BLD. TO BE ALTERED & ENLARGED INTO 6 STORY MULTIPLE DWELLING. CLASS OF CONSTRUCTION TO BE UPGRADED TO I-B. ALTERATION CO APP. FILED TO MEET NB REQUIREMENTS. A NEW C OF O WILL BE OBTAINED.
B01371077-S3: STRUCTURAL WORK FILED IN CONJUNCTION WITH ALT. CO B01371077-I1 FOR 6 STORY W/ PENTHOUSE CONCRETE RESIDENTIAL BUILDING.
B01371077-S5: PLUMBING WORK FILED IN CONJUNCTION WITH ALT. CO B01371077-I1 FOR 6 STORY W/ PENTHOUSE CONCRETE RESIDENTIAL BUILDING.
B01371077-S6: FILING TO INSTALL SPRINKLERS IN 6 STORY RESIDENTIAL BUILDING. FILED SUBSEQUENTLY WITH ALT. CO B01371077-I1.
B01371077-S4: MECHANICAL WORK FILED IN CONJUNCTION WITH ALT. CO B01371077-I1 FOR 6 STORY W/ PENTHOUSE CONCRETE RESIDENTIAL BUILDING.
B01371077-S2: FOUNDATION AND EARTH WORK FILED IN CONJUNCTION WITH ALT. CO B01371077-I1 FOR 6 STORY W/ PENTHOUSE CONCRETE RESIDENTIAL BUILDING.
B01371077-S7: PARTIAL DEMO OF 3 STORY W/ CELLAR FRAMED BUILDING LOCATED AT 1098 MANHATTAN AVE. GC TO FOLLOW PROTECTION & SAFETY RECOMMENDATIONS ON GENERAL NOTES, PROTECTION NOTES, DEMO SEQUENCES, DEBRIS REMOVAL NOTES & ANY ADDITIONAL NOTES PART OF DRAWINGS. CONTINUED
B01371077-S1: SUPPORT OF EXCAVATION WORK FILED IN CONJUNCTION WITH ALT. CO B01371077-I1 FOR 6 STORY W/ PENTHOUSE CONCRETE RESIDENTIAL BUILDING. SOE TO INCLUDE SHORING & BRACING WITH DRILLED SOLDIER PILES AND LAGGING, RAKER AND WALER BRACING, SLOPING & STEEL BRACIN
Status timeline
- Apr 29, 2026 — New job filed (Objections) B01371077-I1
- Jul 7, 2026 — New job filed (Objections) B01371077-S4
- Jul 7, 2026 — New job filed (Objections) B01371077-S5
- Jul 7, 2026 — New job filed (Objections) B01371077-S6
- Aug 4, 2026 — New job filed (Plan Examiner Review) B01371077-S1
- Aug 4, 2026 — New job filed (Objections) B01371077-S2
- Aug 4, 2026 — New job filed (Objections) B01371077-S3
- Oct 6, 2026 — New job filed (Plan Examiner Review) B01371077-S7
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.