Neighborhoods › Fort Greene › Building 3058695
Interior renovation: Proposed renovation of the existing sro building into a…, est. $685K
25 St Felix Street, Brooklyn 11222 · Permit Entire
| Job | B01362403 (6 filings: I1, S3, S4, S1, S5, S2) · Alteration CO |
|---|---|
| Category | interior renovation |
| Estimated cost | $684,540 |
| Scale | 4 → 4 stories; 6 → 2 dwelling units; 3,801 sq ft |
| Work types | General Construction |
| Filed | Feb 25, 2026 |
| Professional | Studiosc Architecture Pllc |
| Building | BIN 3058695 · BBL 3020970023 |
| Official record | DOB NOW job B01362403 |
DOB description
B01362403-I1: Proposed renovation of the existing SRO building into a 2-Family Building as per the plan. Obtain new C of O.
B01362403-S3: MECHANICAL FILING DESIGN INCLUDES THE INSTALLATION OF TOILET AND KITCHEN EXHAUST FOR THE DWELLING UNITS, AND INSTALLATION OF NEW MULTI SPLIT / VRF HEAT PUMPS FOR THE SPACE HEATING OF THE DWELLING UNITS. NO CHANGE IN USE, EGRESS UNDER THIS FILING.
B01362403-S4: Remove existing plumbing fixtures and install new plumbing fixtures as per plan, filed in conjunction with GC # B01362403-I1
B01362403-S1: Propose new floor openings for stair, new windows openings, interior supports, replace floors and joists with new for existing 3-story building as per plan, filed in conjunction with GC # B01362403-I1.
B01362403-S5: Propose removal of existing sprinkler heads and install new heads as per plan, filed in conjunction with GC # B01362403-I1.
B01362403-S2: Proposed footings for a existing 3-story townhouse with cellar and basement as per plan, filed in conjunction with GC # B01362403-I1.
Status timeline
- Feb 25, 2026 — New job filed (Permit Entire) B01362403-I1
- Mar 16, 2026 — New job filed (Permit Entire) B01362403-S1
- Mar 16, 2026 — New job filed (Permit Entire) B01362403-S2
- Apr 23, 2026 — New job filed (Permit Entire) B01362403-S3
- Apr 23, 2026 — New job filed (Permit Entire) B01362403-S4
- May 6, 2026 — New job filed (Permit Entire) B01362403-S5
- Jul 6, 2026 — Permit issued — work can start (Structural) B01362403-S1
- Jul 6, 2026 — Permit issued — work can start (Foundation) B01362403-S2
- Jul 7, 2026 — Permit issued — work can start (Permit Entire) B01362403-S1
- Jul 7, 2026 — Permit issued — work can start (Permit Entire) B01362403-S2
- Jul 8, 2026 — Permit issued — work can start (Mechanical Systems) B01362403-S3
- Jul 8, 2026 — Permit issued — work can start (Plumbing) B01362403-S4
- Jul 9, 2026 — Permit issued — work can start (Permit Entire) B01362403-S3
- Jul 9, 2026 — Permit issued — work can start (Permit Entire) B01362403-S4
- Jul 9, 2026 — Permit issued — work can start (Sprinklers) B01362403-S5
- Jul 10, 2026 — Permit issued — work can start (Permit Entire) B01362403-S5
- Jul 19, 2026 — Permit issued — work can start (General Construction) B01362403-I1
- Jul 20, 2026 — Permit issued — work can start (Permit Entire) B01362403-I1
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| B01362403-I1-GC | General Construction | Permit Issued | Jul 19, 2026 | Nov 3, 2026 |
| B01362403-S5-EW-SP | Sprinklers | Permit Issued | Jul 9, 2026 | Nov 30, 2026 |
| B01362403-S3-MS | Mechanical Systems | Permit Issued | Jul 8, 2026 | Nov 3, 2026 |
| B01362403-S4-PL | Plumbing | Permit Issued | Jul 8, 2026 | Nov 30, 2026 |
| B01362403-S1-ST | Structural | Permit Issued | Jul 6, 2026 | Nov 3, 2026 |
| B01362403-S2-FO | Foundation | Permit Issued | Jul 6, 2026 | Nov 3, 2026 |
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.