Neighborhoods › Prospect Heights › Building 3027948
New 7-story building, 14 units
654 Washington Avenue, Brooklyn 11375 · Objections
| Job | B01358059 (9 filings: I1, S1, S2, S3, S4, S5, S6, S7, S8) · New Building |
|---|---|
| Category | new building |
| Estimated cost | not stated |
| Scale | — → 7 stories; — → 14 dwelling units; 28,288 sq ft |
| Work types | General Construction |
| Filed | Mar 4, 2026 |
| Professional | Arc Architecture + Design Studio |
| Building | BIN 3027948 · BBL 3011390024 |
| Official record | DOB NOW job B01358059 |
DOB description
B01358059-I1: PROPOSED NB 7-STORY RESIDENTIAL BUILDING AS PART OF ONE ZONING LOT COMPRISED OF TWO TAX LOTS, IN CONJUNCTION WITH NB APPLICATION FOR A 2-STORY BUILDING (B01355039-I1).
B01358059-S1: CONSTRUCTION FENCE IN CONJUNCTION WITH DOB#B01358059-I1.
B01358059-S2: CURB CUT WORK TYPE IN CONJUNCTION WITH NB# B01358059-I1
B01358059-S3: Support of excavation for 7 story building with partial cellar.
B01358059-S4: Respectfully requesting the approval of drawings.
B01358059-S5: Respectfully requesting approval of drawings.
B01358059-S6: Filing herewith the mechanical work for the construction of a new seven story apartment building consisting of 14 residential units and associated amenity spaces.
B01358059-S7: FILING HEREWITH PLUMBING WORK FOR THE NEW RESIDENTIAL BUILDING - CELLAR THRU 7TH FLOORS AND ROOF
B01358059-S8: This application is being filed for the installation of a new automatic wet-pipe sprinkler system throughout the new seven-story residential building.
Status timeline
- Mar 4, 2026 — New job filed (Objections) B01358059-I1
- Mar 24, 2026 — New job filed (Approved) B01358059-S7
- Mar 25, 2026 — New job filed (Approved) B01358059-S6
- Apr 21, 2026 — New job filed (Approved) B01358059-S3
- Apr 21, 2026 — New job filed (Objections) B01358059-S5
- Apr 22, 2026 — New job filed (Objections) B01358059-S4
- Aug 20, 2026 — New job filed (Approved) B01358059-S8
- Aug 23, 2026 — New job filed (Approved) B01358059-S1
- Aug 24, 2026 — New job filed (Objections) B01358059-S2
- Sep 1, 2026 — Plans approved (Approved) B01358059-S8
- Sep 17, 2026 — Plans approved (Approved) B01358059-S1
- Sep 22, 2026 — Plans approved (Approved) B01358059-S6
- Sep 22, 2026 — Plans approved (Approved) B01358059-S7
- Oct 6, 2026 — Plans approved (Approved) B01358059-S3
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.