Neighborhoods › Fort Greene › Building 3055872
Full demolition of 4-story building, est. $579K
54 Greene Avenue, Brooklyn 08753 · Objections
| Job | B01356472 (6 filings: I1, P1, S2, S1, S3, S4) · Alteration CO |
|---|---|
| Category | demolition |
| Estimated cost | $578,767 |
| Scale | 4 → 4 stories; 4 → 3 dwelling units; 4,674 sq ft |
| Work types | General Construction |
| Filed | Mar 25, 2026 |
| Professional | Jba |
| Building | BIN 3055872 · BBL 3019580019 |
| Official record | DOB NOW job B01356472 |
DOB description
B01356472-I1: full gut renovation of an existing 4 story structure, including interior partial non structural demolition, new partitions, new finishes. to obtain new CO. Proposed 3 family dwelling + bulkhead at roof
B01356472-P1: NEW SPRINKLER SYSTEM SUBSEQUENT TO ALT 1 APPLICATION.
B01356472-S2: NEW SPRINKLER SYSTEM SUBSEQUENT TO ALT 1 APPLICATION.
B01356472-S1: HEREWITH TO PROPOSE PL SYSTEMS, IN CONJUNCTION WITH DOB# B01356472-I1
B01356472-S3: STRUCTURAL ALTERATION OF EXISTING 4-STORY BUILDING WITH CELLAR AND BASEMENT, INCLUDING SHORING, SELECTIVE WALL DEMOLITION, NEW/INFILLED OPENINGS, JOIST REPAIR/REPLACEMENT, STAIR OPENINGS, BULKHEAD, MASONRY REPAIRS, AND GARAGE ROOF/ROOF TERRACE FRAMING.
B01356472-S4: HEREWITH TO PROPOSE NEW MECHANICALSYSTEMS HEATING & COOLING SYSTEM, ALONGKITCHEN & BATHROOM EXHAUSTS) AS PERPLANS IN CONJUCTION WITH DOB JOB#B01356472-I1
Status timeline
- Mar 25, 2026 — New job filed (Objections) B01356472-I1
- Mar 26, 2026 — New job filed (Objections) B01356472-S1
- Apr 30, 2026 — New job filed (Approved) B01356472-S2
- May 18, 2026 — Plans approved (Approved) B01356472-S2
- Aug 13, 2026 — New job filed (Objections) B01356472-P1
- Aug 20, 2026 — New job filed (Objections) B01356472-S4
- Aug 31, 2026 — New job filed (Objections) B01356472-S3
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.