NYC Permit AlertsBy BuildPermitGuide

Neighborhoods › Sunset Park (Central) › Building 3013392

Enlargement, est. $300K

5003 7 Avenue, Brooklyn 11354 · Permit Entire

JobB01340542 (8 filings: I1, S2, S1, S3, S5, S6, S9, Z1) · Alteration CO
Categoryvertical enlargement
Estimated cost$300,000
Scale3 → 3 stories; 3 → 2 dwelling units; 2,507 sq ft
Work typesGeneral Construction
FiledJan 13, 2026
ProfessionalJx Flame Solution Inc
BuildingBIN 3013392 · BBL 3007940008
Official recordDOB NOW job B01340542

DOB description

B01340542-I1: PROPOSED HORIZONTAL ENLARGEMENT AT 1ST FLOOR OF A 3 STORY BUILDING. CONVERT THE CELLAR AND 1ST FLOOR TO COMMERCIAL USE SPACE. OBTAIN NEW C OF O.
B01340542-S2: PROPOSED STRUCTURAL WORK FOR A (3) STORIES BUILDING, FIRST FLOOR HORIZONTAL EXTENSION AND REPLACE FIRST FLOOR TO STEEL MEMBERS AND CONCRETE DECK, REAR EXTENSION IS CMU WALL WITH BRICK VENEER.
B01340542-S1: PROPOSED FOUNDATION WORK FOR A (3) STORIES BUILDING FOR HORIZONTAL EXTENSION ON THE FIRST FLOOR ONLY, REINFORCED CONCRETE FOUNDATION CONSTRUCTION
B01340542-S3: FILE SPRINKLER WORK IN CONJUNCTION WITH ALT-CO JOB#B01340542-I1. INSTALL SPRINKLER SYSTEMS AT CELLAR 1ST FLOOR.
B01340542-S5: PROPOSED SUPPORT OF EXCAVATION AND TEMPORARY SHORING CONSTRUCTION
B01340542-S6: INSTALL CONSTRUCTION WOOD FENCE AT OPEN SPACE.
B01340542-S9: SUBSEQUENT PLUMBING WORK FILING. INSTALL STEEL SLEEVE FOR SEWER WORK IN THE FRONT OF BUILDING ONLY.
B01340542-Z1: FILE BOILER WORK TYPE. INSTALL BOILERS AT 2ND AND 3RD FLOOR.

Status timeline

Work permits

PermitWorkStatusIssuedExpires
B01340542-S1-FOFoundationSigned-offAug 4, 2026Jan 10, 2027
B01340542-S2-STStructuralSigned-offAug 4, 2026Jan 10, 2027
B01340542-S6-FNConstruction FencePermit IssuedAug 4, 2026Jan 10, 2027
B01340542-S5-SESupport of ExcavationSigned-offAug 3, 2026Jan 10, 2027
B01340542-I1-GCGeneral ConstructionPermit IssuedJul 28, 2026Jan 10, 2027

Map

Watch this block

Get an email when the next job is filed within 100 ft of this address. Free, weekly.