Neighborhoods › Borough Park › Building 3130640
Interior renovation: Herewith filing for an interior renovation on floors…, est. $190K
5516 16 Avenue, Brooklyn 11432 · Permit Entire
| Job | B01304473 (5 filings: I1, S1, S2, S5, S4) · Alteration |
|---|---|
| Category | interior renovation |
| Estimated cost | $190,080 |
| Scale | 3 → 3 stories; 4 → 4 dwelling units; 4,320 sq ft |
| Work types | General Construction |
| Filed | Oct 19, 2025 |
| Professional | Mohammad Ahead, Pe |
| Building | BIN 3130640 · BBL 3054880044 |
| Official record | DOB NOW job B01304473 |
DOB description
B01304473-I1: HEREWITH FILING FOR AN INTERIOR RENOVATION ON FLOORS CEL-002 FILING TO EXCAVATE EXISTING CELLAR AT2'-0". FILING TO REMOVE AND REPLACE EXISTING FLOOR JOISTS AT FIRST FLOOR WITH CONT. METAL JOIST THROUGHOUT FLOOR. NO CHANGE IN USE,OCCUPANCY OR EGRESS.
B01304473-S1: HEREWITH FILING FOR AN INTERIOR RENOVATION ON FLOORS CEL-002. FILING FOR A PLUMBING APPLICATION FOR THE DIRECT REPLACEMENT OF PLUMBING FIXTURES AT THE SAME LOCATIONS AT FLOORS CEL AND 002. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01304473-S2: Filing FO drawings in conjunction with GC application, job #B01304473.
B01304473-S5: PROPOSED FOUNDATION WORK FILING #B01304473-S5 IN CONJUNCTION WITH G/C FILING #B01304473-I1
B01304473-S4: HEREWITH FILING A STRUCTURAL APPLICATION TO REMOVE EXISTING FLOOR FRAMING AT FIRST FLOOR AND REPLACEWITH CONTINUOUS SPAN METAL C JOISTS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
Status timeline
- Oct 19, 2025 — New job filed (Permit Entire) B01304473-I1
- Dec 1, 2025 — New job filed (Permit Entire) B01304473-S1
- Dec 1, 2025 — New job filed (Permit Entire) B01304473-S4
- Dec 17, 2025 — New job filed (Objections) B01304473-S2
- Aug 31, 2026 — Permit issued — work can start (Plumbing) B01304473-S1
- Sep 1, 2026 — Permit issued — work can start (Permit Entire) B01304473-S1
- Sep 1, 2026 — New job filed (Approved) B01304473-S5
- Sep 2, 2026 — Permit issued — work can start (General Construction) B01304473-I1
- Sep 3, 2026 — Permit issued — work can start (Permit Entire) B01304473-I1
- Sep 3, 2026 — Permit issued — work can start (Structural) B01304473-S4
- Sep 4, 2026 — Permit issued — work can start (Permit Entire) B01304473-S4
- Oct 7, 2026 — Plans approved (Approved) B01304473-S5
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| B01304473-S4-ST | Structural | Permit Issued | Sep 3, 2026 | May 20, 2027 |
| B01304473-I1-GC | General Construction | Permit Issued | Sep 2, 2026 | May 20, 2027 |
| B01304473-S1-PL | Plumbing | Permit Issued | Aug 31, 2026 | Mar 15, 2027 |