Neighborhoods › Bushwick (West) › Building 3071774
Facade/scaffold work: Installation of temporary barricade as per plan. no…, est. $1K
81 Beaver Street, Brooklyn 11377 · Approved
| Job | B00950601 (4 filings: P8, P5, P6, P7) · Alteration |
|---|---|
| Category | facade/scaffold |
| Estimated cost | $1,000 |
| Work types | Protection & Mechanical Methods |
| Filed | Oct 8, 2026 |
| Professional | Tohfaz Uddin Pe Pc |
| Building | BIN 3071774 · BBL 3031350027 |
| Official record | DOB NOW job B00950601 |
DOB description
B00950601-P8: INSTALLATION OF TEMPORARY BARRICADE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00950601-P5: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIPE SCAFFOLD IS TO THE TOP OF THE SIDEWALK SHED AT EAST, WEST, NORTH (TO MAIN ROOF LEVEL), SOUTH (FROM 2ND FL TO MAIN ROOF LEVEL/ PENTHOUSE ROOF)
B00950601-P6: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00950601-P7: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIPE SCAFFOLD IS TO THE TOP OF THE SIDEWALK SHED AT EAST, WEST, NORTH (TO MAIN ROOF LEVEL), SOUTH (FROM 2ND FL TO MAIN ROOF LEVEL/ PENTHOUSE ROOF)
Status timeline
- Oct 23, 2025 — New job filed (Approved) B00950601-P5
- Oct 24, 2025 — Plans approved (Approved) B00950601-P5
- Apr 19, 2026 — New job filed (Approved) B00950601-P6
- Apr 19, 2026 — New job filed (Approved) B00950601-P7
- Apr 20, 2026 — Plans approved (Approved) B00950601-P7
- Apr 20, 2026 — Plans approved (Approved) B00950601-P6
- Oct 8, 2026 — New job filed (Approved) B00950601-P8
- Oct 13, 2026 — Plans approved (Approved) B00950601-P8
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| B00950601-I1-SH | Sidewalk Shed | Permit Issued | Mar 17, 2026 | Dec 8, 2026 |
| B00950601-S2-FN | Construction Fence | Permit Issued | Jan 5, 2026 | Feb 26, 2027 |
| B00950601-S3-PMM | Protection and Mechanical Methods | Permit Issued | Jan 5, 2026 | Jan 6, 2027 |
| B00950601-S4-PMM | Protection and Mechanical Methods | Permit Issued | Jan 5, 2026 | Jan 6, 2027 |
| B00950601-S5-PMM | Protection and Mechanical Methods | Permit Issued | Jan 5, 2026 | Jan 6, 2027 |
| B00950601-S1-SF | Supported Scaffold | Signed-off | Nov 13, 2025 | Feb 25, 2027 |
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.