Neighborhoods › Sunset Park (West) › Building 3342375
Full demolition of 4-story building, est. $266K
224 22 Street, Brooklyn 11563 · Approved
| Job | B00846046 (3 filings: P8, P7, P9) · Alteration |
|---|---|
| Category | demolition |
| Estimated cost | $266,000 |
| Scale | 4 → 4 stories; 14 → 12 dwelling units; 3,250 sq ft |
| Work types | Structural |
| Filed | Mar 8, 2026 |
| Professional | Celin Munoz Consulting Engineer, Pc |
| Building | BIN 3342375 · BBL 3006467501 |
| Official record | DOB NOW job B00846046 |
DOB description
B00846046-P8: Demolition and shoring drawings for CMU bearing walls at first floor existing of 4 story residential structure. Steel frame stabilization system. Repair of existing internal bearing walls all floors. The building will be vacated during construction.
B00846046-P7: Foundation stabilization system and design for existing of 4 story residential structure.
B00846046-P9: REPLACEMENT OF FOURTEEN (14) GAS METERS AND HOT WATER HEATERS TO ENABLE REMEDIAL STRUCTURAL WORK. REMOVE & REINSTALL ALL FIXTURES IN APTS 1A & 1B AND THE EXISTING LAUNDRY ROOM. REMOVE & REINSTALL 12 SPRINKLER HEADS. BLDG TO BE VACATED DURING CONSTRUCTION.
Status timeline
- Mar 8, 2026 — New job filed (Objections) B00846046-P7
- Mar 8, 2026 — New job filed (Approved) B00846046-P8
- Mar 23, 2026 — Plans approved (Approved) B00846046-P8
- Sep 24, 2026 — New job filed (Plan Examiner Review) B00846046-P9
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| B00846046-S4-PL | Sprinklers | Permit Issued | Jun 3, 2026 | Nov 27, 2026 |
| B00846046-Z2-MS | Mechanical Systems | Permit Issued | May 18, 2026 | Jan 1, 2027 |
| B00846046-S6-FO | Foundation | Permit Issued | Apr 9, 2026 | Jan 1, 2027 |
| B00846046-S5-ST | Structural | Permit Issued | Mar 24, 2026 | Jan 2, 2027 |
| B00846046-I1-GC | General Construction | Permit Issued | Mar 10, 2026 | Jan 2, 2027 |
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.