Interior renovation: Proposed merger of tax lots 10, 13 into single tax lot…, est. $390K

778 Alabama Avenue, Brooklyn 11364 · Objections

JobB00762744 (10 filings: A7, P7, A3, A2, A9, P8, A1, A6, A8, P9) · Alteration CO
Categoryinterior renovation
Estimated cost$390,250
Scale1 → 1 stories; 11,411 sq ft
Work typesGeneral Construction
FiledJul 12, 2026
ProfessionalNeville Engineering Group
BuildingBIN 3097649 · BBL 3043430010
Official recordDOB NOW job B00762744

DOB description

B00762744-A7: Proposed merger of Tax Lots 10, 13 Into single Tax Lot and Zoning. Revise use and occupancy, as noted. Subdivision was filed under separate job #322108580.
B00762744-P7: Proposed merger of Tax Lots 10, 13 Into single Tax Lot and Zoning. Revise use and occupancy, as noted. Subdivision was filed under separate job #322108580.
B00762744-A3: Proposed alteration to existing sprinkler system, including the installation and relocation of existing sprinkler heads and piping. No change to use, occupancy or egress under this application.
B00762744-A2: proposed installation of 8-natural gas type ceiling mounted radiant space heaters and a 60-gal electric water heater and new plumbing fixtures. two spray booth installation shall be filed under separate application and all its utilities.
B00762744-A9: proposed installation of 8-natural gas type ceiling mounted radiant space heaters and a 60-gal electric water heater and new plumbing fixtures. two spray booth installation shall be filed under separate application and all its utilities.
B00762744-P8: proposed installation of 8-natural gas type ceiling mounted radiant space heaters and a 60-gal electric water heater and new plumbing fixtures. two spray booth installation shall be filed under separate application and all its utilities.
B00762744-A1: Proposed installation of new heating and cooling units, ventilation and exhaust fans. No change to use, occupancy or egress under this application.
B00762744-A6: Proposed installation of new heating and cooling units, ventilation and exhaust fans. No change to use, occupancy or egress under this application.
B00762744-A8: REVISED PLANS PER FDNY DEF LTR DTD 7-13-2026, FOR Proposed installation of two prefabricated paint Spray Booths, with one prefabricated mix room, duct work thru ceiling and gas connection flammable burn unit & MAX 20 GALLONS PAINT STORAGE.
B00762744-P9: Proposed installation of two prefabricated paint Spray Booths, with one prefabricated mix room, duct work thru ceiling and continuing on roof top for termination, and gas connection flammable burn unit. (Continued in 'Comments').

Status timeline

Work permits

PermitWorkStatusIssuedExpires
B00762744-S4-STStructuralSigned-offApr 12, 2026Apr 26, 2026
B00762744-S9-CCCurb CutPermit IssuedApr 12, 2026Apr 26, 2026
B00762744-S7-CCCurb CutPermit IssuedApr 9, 2026Apr 26, 2026
B00762744-Z1-CCCurb CutPermit IssuedApr 9, 2026Apr 26, 2026
B00762744-S5-MSMechanical SystemsPermit IssuedFeb 19, 2026Apr 26, 2026
B00762744-S2-EW-SPSprinklersPermit IssuedJan 22, 2026Jan 23, 2027
B00762744-S3-MSMechanical SystemsPermit IssuedDec 4, 2025Apr 26, 2026