NYC Permit AlertsBy BuildPermitGuide

Neighborhoods › Bedford-Stuyvesant (West) › Building 3325593

Interior renovation: Nycha boiler- structural filing for removal of boilers, est. $2.3M

603 Park Avenue, Brooklyn 10017 · Incomplete

JobB00563033 (5 filings: A1, P9, P6, P7, P8) · Alteration
Categoryinterior renovation
Estimated cost$2,300,000
Scale6 → 6 stories; 116 → 116 dwelling units; 1,500 sq ft
Work typesStructural
FiledOct 12, 2026
ProfessionalYsrael A. Seinuk, P.C.
BuildingBIN 3325593 · BBL 3017190001
Official recordDOB NOW job B00563033

DOB description

B00563033-A1: NYCHA BOILER- STRUCTURAL FILING FOR REMOVAL OF BOILERS
B00563033-P9: NYCHA BOILER - Removal of boilers and related equipment, replacement of equipment to remain, and related minor exterior work. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B00563033-P6: NYCHA Boilers- Provide vacuum/condensate pump and condensate transfer pumps with surge tank including associated piping, valves and accessories. Provide temporary condensate pump and temporary boiler feed unit including associated piping, and accessoriess
B00563033-P7: NYCHA BOILER - 7 EXISTING BOILERS TO BE REMOVED BY CONTRACTOR. REMOVE BREECHING, STEAM AND CONDENSATE RETURN PIPING TO EXISTING BOILER, ASSOCIATED VALVES, FUEL OIL PIPES, CONTROLS AND SUPPORTS.
B00563033-P8: NYCHA BOILER- REMOVE EXISTING PILOT AND GAS PIPING TO EXISTING BUILDING #9 BOILER. PROVIDE NEW LOW PRESSURE GAS SERVICE FOR EXISTING BOILER ROOM BUILDING#9. PROVIDE NEW METER/REGULATOR PER UTILITY REQUIREMENTS

Status timeline

Map

Watch this block

Get an email when the next job is filed within 100 ft of this address. Free, weekly.